2 X 70kW SOLARFOCUS PelletTop
with wood pellet vacuum suction
2x 2,000ltrs
Of buffer storage
8 Tonne 
bespoke fuel storage design and build

Project Overview


Technology
Two 70kW SOLARFOCUS PelletTop pellet boilers with two 2,000 litre buffer tanks and a fresh water module (for producing hygienic and instantaneous hot water at up to 40 litres per minute).The boilers are built in the science lab while the buffer tanks take up a corner of the staff room.

Cascade systems
For sites where it is imperative that the heating system is always available two or more boilers in cascade is recommended. This ensures that in the case of routine maintenance or in the event of a boiler breakdown there is always a back-up boiler.

RHI payments
Approximately £10,500 per year.

Project Information


  • Village School
  • Pellet Boiler
  • District Heat Main
  • Commercial
  • Eligible for RHI

Contact Us


We’d love to hear from you.
Just choose the most convenient method and we’ll get back to you as soon as we can.